You must be logged in and verified to contact the designer.
Product Description
i desigtned that for having a full dig function at the scx24
what you need:
2x M2x9 Bolts
2x M2 flat nuts
2x Motors with gearbox
i used orlandoo motors with 500rpm they are a good
not much speed but enugh torque for this rig.
you have to grind down the motorshaft a littele to mount the driveshaft
after putting in the nuts you can install the motors in the motormount.
next you have to drill out the skid plate.
2mm on both holes.
after that you kan mount everything on the skid
to finish this projekt i used 2 cheap china esc´s and a sanwa reciver with 4 channels and moa mix (you can use somthing like that....)
now it´s possible to dig front and rear axle
We're sorry to inform you that we no longer support this browser and can't confirm that everything will work as expected. For the best Shapeways experience, please use one of the following browsers: