Attention - please read!
This part is also meant to be used with custom made pipes that are more screen accurate than the stock pipes. Only order this part if you wish to create your own pipes. If not than take a look at my other product in my shop called DeAgo Millennium Falcon Frames and Pipes section (rear) that also comes with the corresponding pipes for this design. Also, this frames and pipes section is meant for modellers who want to add their own detailing to the frames.
Description
This replacement frames section was designed to replace the stock parts that stand against the aft wall (left side of the port wall) and addresses two issues:
1) If you decide to replace the door on the port wall that gives access to the circuitry bay with a movie accurate one, you will notice that the stock last frame is blocking the movie accurate replacement door. This frames section is placed deeper in the hold in order to solve this problem and free that door.
2) Accuracy: this frames section is more screen accurate and matches the frames section seen in Empire Strikes Back.
Assembly
This part was designed to fit the stock DeAgo cargo hold and has the exact width as the stock part. As this part is placed deeper in the hold you may need to fill the holes on the floor meant for the insertion of the stock parts with putty. You may also have to remove the notches that hold the the stock pipes in place.
The ceiling contains screen accurate rectangular holes and you could add a transparent sheet of plastic and led lights to create the same lighting effect as in the movie.