You must be logged in and verified to contact the designer.
Product Description
This is a NSWGR sleeper built take-off for track maintenance equipment often found alongside the main line where equipment may need to be taken off the track to allow trains to pass.
Here is a NSWGR plan showing that there should be a 1 in 40 slope away from the track to stop the equipment from rolling towards the track.
We're sorry to inform you that we no longer support this browser and can't confirm that everything will work as expected. For the best Shapeways experience, please use one of the following browsers: